V-ZUG Blog | EN LogoLoading
V-ZUG_PowerSteam_1155x650px

Precision work from a single pair of hands

The new appliance from V-ZUG, the CombiSteamer V6000 45M PowerSteam, requires some very specific know-how to assemble. The very small specialist team includes Adriano Pirisi as Head of Steamer Production and his colleague Stefan Budak. We paid them a visit. Continue reading

blog-header-patrik-rechsteiner-1155x650px

“Positive people achieve more”

As Head of Operations, Patrik Rechsteiner makes sure everything is in place so that people can do their work well. And he’s currently doing that at two sites – in Arbon and Sulgen. Continue reading

vzug-sulgen-edin-muslic-header-1155x650px

“Identifying opportunities and adapting our production facility”

A cooling appliance produced every 53 seconds: as Senior Strategy Manager, Edin Muslic ensures that there is good chemistry between the machines in Sulgen. Continue reading

VZUG-patrick-meyer-header-web-1155x650px.

“Efficiency thanks to smart automation”

Patrick Meyer is Group Leader for Design Manufacturing and Process Analyses. He and his team have raised the new production line for the Excellence Line to a new level.  Continue reading

VZUG-DanielMinder-web-1155x650px.

“We’ve taken a huge leap forward”

In Sulgen, Daniel Minder is responsible for the fully automated high-bay warehouse and for final inspections of cooling appliances. In the process, the project manager relies on an unconventional storage technology solution. Continue reading

VZUG-header-web-1155x650px.

“We’ve built a new home for our company.”

Björn Weiss coordinates plans, dates and costs and communicates with architects, the authorities and site workers. The project manager has complete oversight of the V-ZUG Kühltechnik AG new build, as well as a keen eye for detail. Continue reading

Andreas Albrecht, CEO V-ZUG Kühltechnik AG

“Switzerland definitely has a future as a production location.”

CEO Andreas Albrecht is proud of the new plant in Sulgen. He’s even prouder of the objective everyone in the company has been pursuing for years: a sustainable future for V-ZUG Kühltechnik AG. Continue reading

Shpresim Balazi, Assembly doors Excellence Line V-ZUG

“It’s like when you’re buying a car: you need to check the paintwork and glass extremely carefully.”

Producing the Excellence Line also requires manual assembly work. Shpresim Balazi installs the appliance doors. This task calls for precise manual work and a keen eye. Continue reading

vzug-daniela-arnold-zephyr-west-1155x650px

Construction, installation and future planning

Even as our new coating technology system is being installed in the Zephyr Hangar production facility, we’re already working on our next construction project: as part of the Technology Cluster Zug (TCZ), the Zephyr West high-rise, which will house the V-ZUG offices and testing laboratories, is set to be completed by 2026. Continue reading

VZUG_zephyr-hangar-web-1155x650px

Aiming high: building for today and tomorrow

One hall with multiple facets – sustainable, stylish and durable: last autumn, the new pressing plant on the ground floor of the new Hangar went into operation. As well as being home to the new plant, this summer the hall came to life with the sounds of classical music. Continue reading

1 2

vzug.comlifestyle.vzug.comhome.vzug.comreferences.vzug.comnaming.vzug.com

You are using an obsolete browser. Some contents may therefore not be displayed properly. Please update your browser: http://browsehappy.com